Westgate Community School

Location: Thornton, CO

Project Type: Commercial Repipe

Project Overview

This project involved the repair of failed underground cast iron piping at Westgate Community School, addressing both storm drainage and sewage systems. The scope focused on locating and correcting multiple failure points beneath the building to restore reliable drainage and prevent further damage to the facility.

Scope of Work

  • Underground Storm Piping Repair:
    • Located and repaired failed sections of underground cast iron storm piping beneath the building.
    • Restored proper flow and structural integrity to the storm drainage system.
  • Sewage Drain Replacement:
    • Replaced cast iron sewage drains at multiple failed points identified under the building.
    • Ensured new piping met current code requirements while integrating with the existing underground system.

Challenges and Solutions

  • Challenge: Diagnosing and accessing multiple failure points in aging cast iron piping located underground beneath an occupied school building.
    Solution: Conducted careful excavation and staged repairs to address each failure point while minimizing disruption to the facility.
  • Challenge: Working with deteriorated cast iron material prone to further breakage during repair.
    Solution: Used appropriate techniques and durable replacement materials to ensure long-term reliability at each repaired section.

Results

The completed repairs restored reliable storm and sewage drainage beneath Westgate Community School. The replaced sections eliminated the identified failure points, providing the facility with a dependable underground piping system going forward.

Fall Water Heater Special: 40 Gallon Water Heaters Starting at $1500 Installed! Contact Us to Schedule Today

Our Projects